Ask a studio what a mobile app costs and you should get a range, not a single number. A range is honest. It is only useful, though, if you know how to read it.
This article walks through the parts of a mobile app estimate, what each one tells you, and the questions worth asking before you sign. It applies whether you work with us in Kelowna, elsewhere in Canada, in the United States or further away.
Build cost and monthly cost are two different numbers
The build cost is what it takes to design, develop and test the app up to launch. It is the number most people look at first.
The monthly cost is what it takes to keep the app running after launch. That covers the hosting and outside services the app depends on, and any ongoing work you want done on it.
Keep the two apart in your planning. A cheap build that leans on expensive services can cost you more over a year than a careful build that runs lean. When you compare estimates, compare both numbers, not just the first one.
Effort by role shows where the money goes
A mobile app is not built by one person doing one kind of work. An estimate should break the effort down by role, for example design, mobile development, back-end work, testing and project management.
This breakdown helps you in three ways:
- You can see whether the effort matches your priorities. If your app lives or dies on its look and feel, the design share should reflect that.
- You can spot gaps. An estimate with no testing effort is not a cheaper estimate. It is a riskier one.
- You can talk about trade-offs in concrete terms. Cutting a feature removes effort from specific roles, and you can see which.
We covered the factors that push these hours up or down in a separate piece on what moves the hours on a mobile app build. Here the point is simpler: if an estimate does not show effort by role, ask for it.
The assumptions are the real agreement
Every estimate rests on assumptions. Which platforms the app runs on. Whether it needs accounts and sign-in. Whether it talks to other systems. How many languages it supports. Who supplies the content.
An estimate is only as good as the assumptions written under it.
Read them line by line. If an assumption is wrong, the number is wrong, and it is far cheaper to find that out now than halfway through the build. If something you need is missing from the list, assume it is not in the price.
Weeks are not the same as effort
The number of weeks tells you when you can expect the app. The effort tells you how much work goes into it. They are related, but they are not the same.
Some work can run side by side, such as design on one screen while development starts on another. Some work has to wait, such as testing a feature that is not finished. Adding people does not always shorten the calendar, and it can add coordination cost. If a launch date matters to you, say so early, so the plan is built around it rather than squeezed to fit it later.
Pick a way of working that fits your scope
How you pay shapes how the estimate behaves once work begins. We offer three ways to work.
Table: Ways to work with Atheron Network Labs
| Way to work | Suits you when |
|---|---|
| Fixed price for a defined scope | You know what the app must do and the scope is unlikely to change |
| A team by the month | The product will evolve and you want steady capacity to build it |
| A monthly block of hours with a promised response time | The app is live and you need ongoing changes and support |
A fixed price gives you certainty, but only for the scope that was defined. A monthly team gives you room to change direction. A block of hours keeps a launched app looked after without a full team. None of them is right for everyone.
Get your own range
We do not type prices into articles, because rates change and an old number helps no one. Instead, our estimator gives you a price range in minutes from the current rate card. It shows the build cost, the monthly costs, the effort by role, the weeks and every assumption behind them, which is everything this article asks you to look for.